Waterproofing Systems
Wet Area Waterproofing
Bathrooms, kitchens, balconies and pools tanked with low-odour, fast-turnaround systems.
The engineering brief
What wet area waterproofing involves
Wet areas fail at the details — floor-wall junctions, drain collars, pipe penetrations and door thresholds — rather than in open field areas.
We tank bathrooms, kitchens, balconies, pools and spas with flexible cementitious and liquid systems, reinforcing every junction with bonded tape before tiling begins.

Key benefits
Low-odour systems suit
Low-odour systems suit occupied buildings
Reinforced tape at
Reinforced tape at all junctions and penetrations
Fast cure allows
Fast cure allows early tiling
Tile-adhesive compatible finishes
Tile-adhesive compatible finishes
Flood tested prior
Flood tested prior to handover
Our process
How we deliver wet area waterproofing
Site Survey
Moisture mapping, substrate testing and photographic condition survey of every affected area.
Technical Proposal
Specification, system build-up, quantities and programme issued with consultant-ready documentation.
Surface Preparation
Mechanical grinding, shot blasting or high-pressure cleaning to achieve the specified profile.
System Application
Certified applicators install the approved system in controlled lifts with wet-film thickness checks.
Testing & Handover
Flood testing, adhesion pull-off tests, as-built records and a written warranty.
On site
Representative works




Related of work
Where we have installed this system
Next step
Discuss your wet area waterproofing requirement
An engineer attends site within one working day, diagnoses the root cause and issues a written specification — no obligation.



