Waterproofing Systems

Wet Area Waterproofing

Bathrooms, kitchens, balconies and pools tanked with low-odour, fast-turnaround systems.

The engineering brief

What wet area waterproofing involves

Wet areas fail at the details — floor-wall junctions, drain collars, pipe penetrations and door thresholds — rather than in open field areas.

We tank bathrooms, kitchens, balconies, pools and spas with flexible cementitious and liquid systems, reinforcing every junction with bonded tape before tiling begins.

Wet Area Waterproofing

Key benefits

Low-odour systems suit

Low-odour systems suit occupied buildings

Reinforced tape at

Reinforced tape at all junctions and penetrations

Fast cure allows

Fast cure allows early tiling

Tile-adhesive compatible finishes

Tile-adhesive compatible finishes

Flood tested prior

Flood tested prior to handover

Our process

How we deliver wet area waterproofing

Site Survey

Moisture mapping, substrate testing and photographic condition survey of every affected area.

Technical Proposal

Specification, system build-up, quantities and programme issued with consultant-ready documentation.

Surface Preparation

Mechanical grinding, shot blasting or high-pressure cleaning to achieve the specified profile.

System Application

Certified applicators install the approved system in controlled lifts with wet-film thickness checks.

Testing & Handover

Flood testing, adhesion pull-off tests, as-built records and a written warranty.

On site

Representative works

Wet Area Waterproofing works 1
Wet Area Waterproofing works 2
Wet Area Waterproofing works 3
Wet Area Waterproofing works 4

Next step

Discuss your wet area waterproofing requirement

An engineer attends site within one working day, diagnoses the root cause and issues a written specification — no obligation.