Industrial
Jebel Ali Logistics Hub — Epoxy Flooring
Installation of a heavy-duty resin floor system across a new distribution warehouse including racking zones, aisles and loading bays.
Client requirement
What the client needed
A dust-free, forklift-rated surface with clear traffic zoning, delivered to a fixed handover date ahead of tenant fit-out.
Installation of a heavy-duty resin floor system across a new distribution warehouse including racking zones, aisles and loading bays. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the industrial asset stayed fully operational throughout the works.
Location
Jebel Ali Free Zone, Dubai
Scope
Heavy-duty epoxy screed & line marking

Execution
How the works were sequenced
Mobilisation
Site set-up, HSE induction, access scaffolding and material staging completed within the first week.
Preparation
Removal of failed layers, mechanical preparation and substrate repair to the specified profile.
Installation
System applied in controlled sections with daily QA sign-off and thickness verification.
Testing
Flood and adhesion testing witnessed by the consultant prior to protection layers.
Handover
As-built drawings, warranty documentation and a maintenance schedule issued to the client.
Gallery
Site documentation
BeforeCondition recorded during the diagnostic survey.
AfterCompleted system following testing and handover.
Outcome
Measured results after handover
Location
Jebel Ali Free Zone, Dubai
Scope
Heavy-duty epoxy screed & line marking
Area
18,000 m²
Duration
8 weeks
Related projects
Similar work
Next step
Have a similar requirement?