Industrial

Jebel Ali Logistics Hub — Epoxy Flooring

Installation of a heavy-duty resin floor system across a new distribution warehouse including racking zones, aisles and loading bays.

Client requirement

What the client needed

A dust-free, forklift-rated surface with clear traffic zoning, delivered to a fixed handover date ahead of tenant fit-out.

Installation of a heavy-duty resin floor system across a new distribution warehouse including racking zones, aisles and loading bays. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the industrial asset stayed fully operational throughout the works.

Location

Jebel Ali Free Zone, Dubai

Scope

Heavy-duty epoxy screed & line marking

Jebel Ali Logistics Hub — Epoxy Flooring

Execution

How the works were sequenced

01

Mobilisation

Site set-up, HSE induction, access scaffolding and material staging completed within the first week.

02

Preparation

Removal of failed layers, mechanical preparation and substrate repair to the specified profile.

03

Installation

System applied in controlled sections with daily QA sign-off and thickness verification.

04

Testing

Flood and adhesion testing witnessed by the consultant prior to protection layers.

05

Handover

As-built drawings, warranty documentation and a maintenance schedule issued to the client.

Gallery

Site documentation

Before — Jebel Ali Logistics Hub — Epoxy FlooringBefore

Condition recorded during the diagnostic survey.

After — Jebel Ali Logistics Hub — Epoxy FlooringAfter

Completed system following testing and handover.

Outcome

Measured results after handover

Location

Jebel Ali Free Zone, Dubai

Scope

Heavy-duty epoxy screed & line marking

Area

18,000 m²

Duration

8 weeks

Next step

Have a similar requirement?

An engineer attends site within one working day, diagnoses the root cause and issues a written specification — no obligation.