Waterproofing Systems
Podium Deck Waterproofing
Trafficked and landscaped deck systems detailed for movement, drainage and heavy loading.
The engineering brief
What podium deck waterproofing involves
Podium decks carry landscaping, vehicles and services above occupied space, so a single failure is disruptive and expensive to trace once the build-up is in place.
We waterproof podiums with root-resistant, high-elongation systems, correct falls to outlets, and protect the membrane with drainage boards and screeds before any landscaping is installed.

Key benefits
Root-resistant membranes for
Root-resistant membranes for planted areas
High elongation absorbs
High elongation absorbs deck movement
Corrected falls eliminate
Corrected falls eliminate ponding
Protection layers survive
Protection layers survive follow-on trades
48-hour flood test
48-hour flood test before build-up
Our process
How we deliver podium deck waterproofing
Site Survey
Moisture mapping, substrate testing and photographic condition survey of every affected area.
Technical Proposal
Specification, system build-up, quantities and programme issued with consultant-ready documentation.
Surface Preparation
Mechanical grinding, shot blasting or high-pressure cleaning to achieve the specified profile.
System Application
Certified applicators install the approved system in controlled lifts with wet-film thickness checks.
Testing & Handover
Flood testing, adhesion pull-off tests, as-built records and a written warranty.
On site
Representative works




Related of work
Where we have installed this system
Next step
Discuss your podium deck waterproofing requirement
An engineer attends site within one working day, diagnoses the root cause and issues a written specification — no obligation.



