Diagnostic survey and full structural refurbishment of a five-level car park suffering chloride-induced reinforcement corrosion.
Client requirement
What the client needed
Arrest ongoing deterioration, restore the deck's design life and keep at least 70% of parking bays available at all times.
Diagnostic survey and full structural refurbishment of a five-level car park suffering chloride-induced reinforcement corrosion. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the commercial asset stayed fully operational throughout the works.
Location
Business Bay, Dubai
Scope
Concrete repair, PU deck coating & joints

Execution
How the works were sequenced
Mobilisation
Site set-up, HSE induction, access scaffolding and material staging completed within the first week.
Preparation
Removal of failed layers, mechanical preparation and substrate repair to the specified profile.
Installation
System applied in controlled sections with daily QA sign-off and thickness verification.
Testing
Flood and adhesion testing witnessed by the consultant prior to protection layers.
Handover
As-built drawings, warranty documentation and a maintenance schedule issued to the client.
Gallery
Site documentation
BeforeCondition recorded during the diagnostic survey.
AfterCompleted system following testing and handover.
Outcome
Measured results after handover
Location
Business Bay, Dubai
Scope
Concrete repair, PU deck coating & joints
Area
9,200 m²
Duration
16 weeks