Residential
Marina Residences — Podium Deck Waterproofing
Full replacement of a failed podium deck waterproofing system above occupied basement parking across two residential towers.
Client requirement
What the client needed
The client required a permanent solution to recurring basement leaks without relocating residents or closing the parking levels.
Full replacement of a failed podium deck waterproofing system above occupied basement parking across two residential towers. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the residential asset stayed fully operational throughout the works.
Location
Dubai Marina, Dubai
Scope
Podium waterproofing & landscape deck

Execution
How the works were sequenced
Mobilisation
Site set-up, HSE induction, access scaffolding and material staging completed within the first week.
Preparation
Removal of failed layers, mechanical preparation and substrate repair to the specified profile.
Installation
System applied in controlled sections with daily QA sign-off and thickness verification.
Testing
Flood and adhesion testing witnessed by the consultant prior to protection layers.
Handover
As-built drawings, warranty documentation and a maintenance schedule issued to the client.
Gallery
Site documentation
BeforeCondition recorded during the diagnostic survey.
AfterCompleted system following testing and handover.
Outcome
Measured results after handover
Location
Dubai Marina, Dubai
Scope
Podium waterproofing & landscape deck
Area
6,400 m²
Duration
11 weeks