Infrastructure
Sharjah Interchange — Protective Coating
Protective coating of bridge piers, crossheads and steel parapets exposed to coastal chloride and heavy traffic pollution.
Client requirement
What the client needed
Extend maintenance intervals on a critical highway asset while working entirely within night-time lane closures.
Protective coating of bridge piers, crossheads and steel parapets exposed to coastal chloride and heavy traffic pollution. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the infrastructure asset stayed fully operational throughout the works.
Location
Sharjah, UAE
Scope
Anti-carbonation & steel protection

Execution
How the works were sequenced
Mobilisation
Site set-up, HSE induction, access scaffolding and material staging completed within the first week.
Preparation
Removal of failed layers, mechanical preparation and substrate repair to the specified profile.
Installation
System applied in controlled sections with daily QA sign-off and thickness verification.
Testing
Flood and adhesion testing witnessed by the consultant prior to protection layers.
Handover
As-built drawings, warranty documentation and a maintenance schedule issued to the client.
Gallery
Site documentation
BeforeCondition recorded during the diagnostic survey.
AfterCompleted system following testing and handover.
Outcome
Measured results after handover
Location
Sharjah, UAE
Scope
Anti-carbonation & steel protection
Area
12,500 m²
Duration
14 weeks
Related projects
Similar work
Next step
Have a similar requirement?
An engineer attends site within one working day, diagnoses the root cause and issues a written specification — no obligation.