Hospitality
Palm Resort — Pool & Wet Area Waterproofing
Waterproofing of three swimming pools, associated wet decks, spa areas and landscape planters during a resort refurbishment.
Client requirement
What the client needed
Deliver a fully watertight envelope to a live resort refurbishment programme with zero guest disturbance.
Waterproofing of three swimming pools, associated wet decks, spa areas and landscape planters during a resort refurbishment. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the hospitality asset stayed fully operational throughout the works.
Location
Palm Jumeirah, Dubai
Scope
Pool tanking, wet areas & planters

Execution
How the works were sequenced
Mobilisation
Site set-up, HSE induction, access scaffolding and material staging completed within the first week.
Preparation
Removal of failed layers, mechanical preparation and substrate repair to the specified profile.
Installation
System applied in controlled sections with daily QA sign-off and thickness verification.
Testing
Flood and adhesion testing witnessed by the consultant prior to protection layers.
Handover
As-built drawings, warranty documentation and a maintenance schedule issued to the client.
Gallery
Site documentation
BeforeCondition recorded during the diagnostic survey.
AfterCompleted system following testing and handover.
Outcome
Measured results after handover
Location
Palm Jumeirah, Dubai
Scope
Pool tanking, wet areas & planters
Area
3,100 m²
Duration
9 weeks
Related projects
Similar work
Next step
Have a similar requirement?
An engineer attends site within one working day, diagnoses the root cause and issues a written specification — no obligation.