Al Barsha Villa Community — Roof Systems

Re-roofing programme across 22 villas including membrane replacement, insulation upgrade and reflective cool-roof coating.

Client requirement

What the client needed

A single community-wide specification and warranty covering all villas, completed before the summer peak.

Re-roofing programme across 22 villas including membrane replacement, insulation upgrade and reflective cool-roof coating. Our team surveyed the existing build-up, recorded the failure points and agreed a phased programme with the consultant so the residential asset stayed fully operational throughout the works.

Location

Al Barsha, Dubai

Scope

Roof waterproofing & reflective coating

Al Barsha Villa Community — Roof Systems

Execution

How the works were sequenced

01

Mobilisation

Site set-up, HSE induction, access scaffolding and material staging completed within the first week.

02

Preparation

Removal of failed layers, mechanical preparation and substrate repair to the specified profile.

03

Installation

System applied in controlled sections with daily QA sign-off and thickness verification.

04

Testing

Flood and adhesion testing witnessed by the consultant prior to protection layers.

05

Handover

As-built drawings, warranty documentation and a maintenance schedule issued to the client.

Gallery

Site documentation

Before — Al Barsha Villa Community — Roof SystemsBefore

Condition recorded during the diagnostic survey.

After — Al Barsha Villa Community — Roof SystemsAfter

Completed system following testing and handover.

Outcome

Measured results after handover

Location

Al Barsha, Dubai

Scope

Roof waterproofing & reflective coating

Area

22 villas

Duration

10 weeks